Haier Future Innovation Center
Images
Project Overview
Location
Beijing
Design Duration
2022-2024
Floor Area
89,000 ㎡
Owner
Haier Group
Architect
B + H
Service Type
Facade Consultant
Status
Under Construction
The "Haier Smart Manufacturing · Future Innovation Center" urban renewal project is expected to fully reflect the park's sense of technology and future life experience through the addition of floating lighting and other methods, and create a charming and characteristic block. Simultaneously building a low-carbon park, integrating the dual carbon concept, green building concept, and energy-saving building concept into the entire process of park design, construction, and operation. By using proactive energy-saving equipment, intelligent control of the Internet of Things, solar photovoltaic facilities, and BIM technology, we can achieve energy conservation and carbon reduction throughout the entire lifecycle of buildings.
> <